Most Read
Most Commented
Read more like this
mk-logo
News
Kelana Jaya LRT operating on single track as repair work still ongoing

The Kelana Jaya light rail transit (LRT) service is operating using a single track today as repair and installation work between the KLCC and Kampung Baru stations has not been completed yet.

Transport Minister Wee Ka Siong said inspection conducted by officers from the Rail Enforcement and Rail Planning division of the Land Public Transport Agency (APAD) at 1.19am until 4.30 am today found that the emergency lane on the right at the liner induction motor (LIM) rail 1447 was unstable.

He said the APAD inspection team also ordered the replacement of the damaged linear heat detector sensor cable from tunnel segment 126 up to tunnel segment 96, stretching 28.5 metres, to ensure the fire detection system in the tunnel could work...


Please join the Malaysiakini WhatsApp Channel to get the latest news and views that matter.

Unlocking Article
Unlocking Article
View Comments
ADS